A level 2 home charger with a 240 V outlet already in place costs about $1,650 installed at US-average prices; charging 30 miles a day adds about $50 a month in electricity.

Units

Labor and material prices are scaled to typical levels in your state.

Charger
ft

0 if a 240 V outlet is already at the charging spot.

What else the job needs
Where in the range

Level 2 charger installed, US average

$1,650

Low $1,400High $1,950
Materials
$1,050
Labor
$610
Where the money goes
  • Level 2 charger (240 V)54%
  • Electrician to mount and connect37%
  • Permit9%
ItemMaterialsLaborTotal

Level 2 charger (240 V)

$900$0

$900

$750 to $1,050

Electrician to mount and connect

$0$610

$610

$520 to $710

Permit

$150$0

$150

$130 to $180

Prices are US averages scaled to your state, updated September 2026.

The math
  1. Materials

    $1,050 US average × 1.00 (US average goods prices) = $1,050

  2. Labor

    $610 US average × 1.00 (US average construction wages) = $610

  3. Typical total

    $1,050 + $610 = $1,650

Level 2: charger $600 to $1,200 plus electrician $420 to $800 (Fixr), plus wiring at $6 to $12 per ft and a new circuit when the run is above 0. HomeAdvisor's lower average (a plug on an existing circuit) is shown for comparison.
How this compares with published figures
  • This estimateyour inputs, $1,400 to $1,950
  • Average charger installationHomeAdvisor Jun 2026, $550 to $1,400
  • Average charger installationFixr Jan 2025, $1,000 to $2,500

What charging costs at home

mi
kWh/100 mi

From the car's label.

¢/kWh

US average July 2026 (EIA).

Per month
$50
Per year
$601
Per mile
$0.05
Charging time per day, level 2
1.2 h
Charging math
  1. Energy per day

    30 mi × 30 kWh per 100 mi ÷ 100 = 9 kWh

  2. Cost per year

    9 kWh × 18.31¢ ÷ 100 × 365 days = $601

  3. Charging time

    30 mi ÷ 25 mi of range per hour (DOE) = 1.2 h

A charger runs for hours, so its circuit must be sized and protected for a continuous load. Have a licensed electrician size the breaker and wire, and pull the permit.

EV charger installation cost = the charger + an electrician's labor + any new circuit, wiring, panel work and permit; a level 2 (240 V) home charger with an outlet already at the spot is about $1,650 at US-average prices (range $1,400 to $1,950), and about $2,050 when the electrician runs a new 25 ft circuit from the panel. Charging itself then costs about $50 a month for 30 miles a day at the US average residential price of 18.31 cents per kWh.

How the EV charger installation cost is calculated

Fixr (January 2025) prices a level 2 charger at $600 to $1,200 and the electrician at $420 to $800, and those parts add up to its $1,000 to $2,500 total range, so they are the base. HomeAdvisor (June 2026) reports a lower average of $967 (normal range $554 to $1,381), which is shown as a comparison bar: it fits a charger plugged into a circuit that is already there. New circuit and wiring, a panel upgrade, smart features, outdoor mounting and the permit are separate lines. Your state's wages (BLS) and goods prices (BEA) scale materials and labor.

Cost = charger + electrician + (new circuit + wire run in ft × price per ft) + panel upgrade + permit

PartPrice rangeSource
Level 2 charger$600 to $1,200Fixr
Electrician, mount and connect$420 to $800Fixr
New circuit: breaker and outlet$120 to $200Fixr
Wiring$6 to $12 per ftFixr
Panel upgrade$1,150 to $3,000HomeAdvisor $800 to $2,000, Fixr $1,500 to $4,000
Permit$100 to $200HomeAdvisor
Wi-Fi and smart features$200 to $600HomeAdvisor

Worked example: charger by the panel, then a 25 ft run

With a 240 V outlet at the spot, the charger is $900, the electrician $610 and the permit $150: $1,650. Add a 25 ft run and the new circuit costs $160 plus 25 ft × $9 = $230, so the total is about $2,050. If the panel is full, add a panel upgrade of about $2,100 for $4,100; the electrical panel replacement cost calculator prices that job in full. A level 1 (120 V) setup, which is a cable and a dedicated outlet, comes to about $1,000.

Level 1 or level 2

The DOE's Alternative Fuels Data Center puts level 1 at about 5 miles of range per hour of charging and level 2 at about 25 miles per hour. Thirty miles a day takes 1.2 hours on level 2 and 6 hours on level 1, which the calculator shows below the cost. Level 2 needs a 240 V circuit; level 3 fast charging is priced very differently (Fixr lists $2,750 to $5,500 for labor alone) and is not what this page prices.

The cost of charging

Charging cost = miles per day × kWh per 100 miles ÷ 100 × price per kWh. At 30 miles a day and 30 kWh per 100 miles that is 9 kWh, or about $1.65 a day, $50 a month and $601 a year, roughly 5.5 cents a mile. The 30 kWh per 100 miles is a round default: your car's label gives the real figure. The 18.31 cents is the EIA's US average for July 2026 and your own rate may differ; edit either one. To price other loads at your rate, use the electricity cost calculator.

What raises the price

A long run from the panel, trenching to a detached garage, a panel with no spare capacity, an outdoor install (HomeAdvisor: about $50 for a weatherproof cover, up to $200 for a heavy-duty enclosure), smart features and the wages in your state. The circuit for a charger is a continuous load, so wire and breaker are sized up: use the breaker size calculator, the wire size calculator and the voltage drop calculator for a long run.

DIY or a pro

The charger circuit is a dedicated 240 V line running for hours a day. It is a job for a licensed electrician, and that is also what makes the permit and inspection go smoothly. There is no DIY toggle here.

Permit and incentives

HomeAdvisor puts permits at $100 to $200. Utility and state rebates change often and amounts are not listed here: ask your utility and state energy office before you buy.

Next questions

Check that the service can carry a charger with the electrical load calculator. All estimates are under project costs.

These figures are dated estimates from published national data, adjusted for your state. They are not quotes.